JUB Customer: Interenergo d.o.o., Kelag Group
Challenges
To ensure working and technological conditions in the production premises, a natural gas-fired hot water boiler was installed to produce and supply heat energy. Typical boiler operation at partial load during the heating season enabled potential cost savings to be achieved by installing a CHP plant.
Solution
We supplied and installed a cogeneration unit, type 2G Agenitor 408, operating at 1 x 360 kW nominal power. The unit was placed in the current boiler premises and provides approximately 55% of necessary heat energy and 34% of electric energy to supply the production site. A total of 4,000 hours of annual operation is expected.
Together with the supply and installation of the unit we are, as a 2G Energy partner, providing long-term maintenance.
Year of implementation: 2020